Footbridge
April 2019
2019-04-17
2019-04-17
2017-06-14
2017-06-14
Screenshot of the 2019 point cloud survey. Tmber screens were attached below the bridge to reduce pedestrian exposure to train smoke.
Detail showing level of accuracy of the points and the ability to measure from the survey.
The person is modelled in ArchiCAD
BIMx model of the reconstructed bridge design
BIMx model of the reconstructed bridge design
Screenshot from the BIMx
July 2021 pre opening looking north to the station
East to the Railway Hotel
Looking south
20-11-17 Mary Valley Rattler Footbridge Contract Admin.pdf
Early photo showing post tops courtesy Gympie Regional Council