Footbridge

April 2019

2019-04-17

2017-06-14

Screenshot of the 2019 point cloud survey. Tmber screens were attached below the bridge to reduce pedestrian exposure to train smoke.

Detail showing level of accuracy of the points and the ability to measure from the survey.

The person is modelled in ArchiCAD

BIMx model of the reconstructed bridge design

Screenshot from the BIMx

July 2021 pre opening looking north to the station

East to the Railway Hotel

Looking south

20-11-17 Mary Valley Rattler Footbridge Contract Admin.pdf

Early photo showing post tops courtesy Gympie Regional Council